OTE S.A. |
![]() Refurbishment of OTE Headquarters in 99, Kifissias Ave, Maroussi. In July 4, 2006 for the 1st time in Greece a Category 7 cabling system of 312 outlets, is installed at the 8th floor of the OTE Headquarters, with an option to expand at the other 12 floors of the building. Today, 6 of the remaining 39 wings of the building have being installed and a total of 480 Cat.7 outlets. Installation type: Cat. 7 |